Project Description
Stillwater Crossing
Project Details:
Location: Stillwater, MN
Scope: FRP Drainage System
for Bridges
Project Owner: MnDOT
Value: $500,000.00
Date: 2016 – 2017
We were approached by Aptus Group USA, LLC. to furnish just the labor to install the drainage pipe on the Stillwater Crossing project. We have have a crew there installing the pipe since last summer. When the weather conditions deteriorated over the winter, we had the crew in our shop assembling the brackets. This has been a great opportunity for us.
![20161130_123638](http://www.apcwbe.com/wp-content/uploads/2017/06/20161130_123638-300x225.jpg)
![20160805_083453](http://www.apcwbe.com/wp-content/uploads/2017/06/20160805_083453-300x225.jpeg)